| The Company has wide ranging
specialist expertise and skill in working in restricted areas on chemical and pharmaceutical
installations and the following illustrates the typical range of activities undertaken. |
| Client: |
Cookson Aluminium and Lead Smelting. |
| Project: |
Smelting Plant Dismantling. |
| Hazards: |
Radioactive dust. |
| Method: |
Internally cleaning all plant prior to cold
work shearing and dismantling. |
| Client: |
B.P. Chemicals Limited. |
| Project: |
Demolition of Tank Farm T39/T40. |
| Hazards: |
Live plant and occupied buildings nearby. |
| Method: |
Hydraulic shearing down of buildings and tanks
by cold work method only. |
| Client: |
Hardman's Tar Distillery, Hull. |
| Project: |
Demolition of Tar Distillery. |
| Hazards: |
Removal of complex chemicals, phenols,
aromatic hydrocarbons before demolition. |
| Method: |
Chemicals removed by operatives wearing breathing apparatus
and waste neutralised off site. |
| Client: |
Simon Storage, North Killingholme. |
| Project: |
Remediation of fuel oil contaminated land. |
| Hazards: |
Fuel contamination entering ground water. |
| Method: |
Excavation/mixing of contamination to reduce
pollution level and disposal off site. |
| Client: |
Reckitt Benckiser. |
| Project: |
Removal of contaminated pharmaceutical
manufacturing plant. |
| Hazards: |
Removal of dust hazard to
respiratory system. |
| Method: |
Specialist cleaning of plant and equipment
using respiratory protective equipment. |
| Client: |
British Gas. |
| Project: |
Site decontamination prior to redevelopment. |
| Hazards: |
Contact with and inhalation of toxic vapours on
gas works site causing illness. |
| Method: |
Excavation/mixing to reduce contamination
levels and specialist treatment offsite. |
|